Part 593: The Wheeling Scottish Rite, 1908
In 1908, Thomas G. Moses wrote, “Starting on Wheeling, W. Va. Masonic work, a good contract and I enjoyed the work. The Darius Palace and the approach to Jerusalem were very interesting things to do, and a dozen others with the same amount of interest for others to do.”
For the past two days, I have examined the subject of the scenes that Moses worked on in 1908 – Darius Palace and approach to Jerusalem. Today’s post is about the actual Scottish Rite building in Wheeling, West Virginia, where the scenery was delivered. In 1907, the Wheeling Scottish Rite Masons began the construction of a massive edifice, complete with a theater and scenery by Sosman & Landis. The Wheeling Scottish Rite was built on the corner of Fourteenth and Byron Streets in Wheeling, West Virginia. Previously at that location, was the residence on Mr. James Caldwell. Soon after his marriage in 1839, Caldwell erected a residence, which, with its garden and stable yard.
The Sosman & Landis Studio’s work was short lived, however, as the Wheeling Scottish Rite Cathedral was destroyed by fire on March 4, 1915. Losses were estimated at $50,000. While looking for information to include in the timeline for the “Santa Fe Scottish Rite Temple: Freemasonry, Architecture and Theatre,” I read that the Wheeling Scottish Rite Cathedral was destroyed by fire on the morning of March 5 (“Santa Fe Scottish Rite Bulletin,” April 1915, Vol. II No 4, page 8).
Last week, I discovered another article about the fire published on April 7, 1915. Interestingly, it was posted at fireengineering.com:
“The Masonic Scottish Rite Cathedral at Wheeling, W. Va., was partially destroyed by fire on March 4th, with an estimated loss of about $50,000. The fire started in the basement and is attributed to rubbish. The fire was discovered at 12:20 A. M., and the alarm was sent in over the Gamewell system from a street box. When the department, commanded by Chief Engineer Edward T. Rose arrived, fire was coming out of the windows in the basement. The flames spread through an airshaft to the back of the stage in the main auditorium on the second floor and swept through that and the upper portion of the building, the first floor being damaged by smoke and water. The building, a four story structure, was less than ten years old, and was constructed with brick walls, wood joists and tar paper roof. All partition walls were hollow. There were few hand extinguishers in the building. There was in service one first size Ahrens-Fox engine, two third size Ahrens-Fox engines, one Silsby third size engine, one 85foot aerial ladder, and 9,000 feet of 2 1/2-inch hose. Three 6-inch and five 4-inch hydrants were available, the distance between them being 800 to 1,000 feet. The water pressure at the hydrants was 80 to 65 pounds. In all 11 streams were thrown, including three hydrant and eight engine streams. Three turrets and one cellar nozzle were used. The loss on building amounted to $30,000, and on contents to $20,000. The contents included scenery on stage, paraphernalia of the order, and a large pipe organ. Chief Rose is quoted as saying the fire demonstrated the danger of vertical openings and lack of fire stops, there being a large space under the roof without a fire stop of any kind. Chief Rose sounded a genera! alarm and a call was sent in to Martin’s Ferry and an auto truck responded. (https://www.fireengineering.com/articles/print/volume-57/issue-14/features/scottish-rite-cathedral-at-wheeling-partially-destroyed.html)
The Wheeling Scottish Rite immediately began plans for a new building in 1915, and by October 1916, the new Scottish Rite was completed, dedicated, and held the first reunion. I have uncovered very little about the original Scottish Rite, other than the opening was postponed. On March 18, 1908, the “Daily Telegram” reported “Postponed Is Dedication of Scottish Rite Cathedral as Interior Work Will Not Be Finished” (Clarksburg, West Virginia, page 1). The article continues, ”The new Scottish Rite cathedral, corner of Fourteenth and Byron streets, Wheeling, will not be dedicated until the latter art of June, as the interior work will not be completed until that month. Elliot & Winechell, contractor who built the Empire building and the county jail and sheriff’s residence in the city, are building the cathedral.
It was originally intended to hold the dedication exercises at the time of the spring convocation or reunion of the Consistory of the Valley of West Virginia, but he high officers of the society were notified by the contractors that it would be an impossibility to have it completed and ready for dedication by that time. The paraphernalia for the degree work has been already ordered from the manufacturers.
The spring convocation will be held in the old temple, on Market street Easter week, closing the usual Maundy Thursday banquet. The latter will probably be held in the Arion hall. There will be work in all of the degrees, and they will be exemplified at the old temple.”
Volland business records indicate that the new scenery was delivered by Toomey & Volland Studios of St. Louis, Missouri in 1916. I was surprised when I encountered a image of the 1916 drop curtain for the auditorium. The design reminded me of a Sosman & Landis version (c. 1898-1908) now used in Yankton, South Dakota. It is very likely that some of the scenery delivered for the new Scottish Rite stage was previously owned and painted by Sosman & Landis artists. The drop curtain is characteristic of Sosman & Landis designs, not that delivered by Toomey & Volland artists.
To be continued…