Part 627: The Dallas Scottish Rite, 1909
In 1909, Thomas G. Moses wrote, “The Dallas Masonic work came in early, so did San Francisco and Cleveland, Ohio.” These were only three of six Scottish Rite installations supervised by Moses in 1909 while he was working at Sosman & Landis. Others included Kansas City, Kansas, Winona, Minnesota, and Atlanta, Georgia.
Sosman & Landis delivered 119 drops and stage machinery to the Scottish Rite at 500 S Harwood Street, Dallas. This Temple was not completed until 1913, however, degree productions took place on the stage by 1909. The scenery contract for the stage was negotiated by Bestor G. Brown of M. C. Lilley & Co.
On April 26, 1913, the “Dallas Morning News” described the Masonic Cathedral and Architect Herbert M. Green’s contributions. Keep in mind that the theater of the building was referred to as “the great degree room.”
The article reported, “On the second floor one will find the lobby, which is in Roman Ionic; the Corinthian lodge room is green and gold: candidates lounging room, modified Colonial with color scheme of brown and blue and smoking foyer in the same effect. In the great degree room are columns copied from those in the Temple of Karnak at Thebes. Over sixty shades of color are used harmoniously in the ornamental beams and columns supporting the ceiling of sky blue – a ceiling whereon the stars of the twelve signs of the Zodiac are so cunningly constructed, and with such ingenious electrical attachments that when the great hall is in total darkness, the constellations seem to blaze in all reality from the very heavens above.
The largest stage in Texas is in this degree room – and the largest pipe organ. There are offices restrooms, wardrobe rooms, bowling alley, grill and kitchen – heating, ventilating and lighting systems which are unsurpassed, push button elevator and house telephone system – In short every device by which modern ingenuity can add to beauty and comfort and convenience.”
The article further described that the theater, “a proscenium arch 28×22 feet is the largest stage in Texas, 24 feet deep and 60 feet in width. One hundred and nineteen scenic drops are so delicately counterweighted that the stage picture can be changed in two seconds, and if necessary in the dark. These drops are hung over the entire ceiling of the stage, being spaced three inches apart from the proscenium arch to the rear wall of the stage. Each degree has its own scenery, some degrees three and four scenes, all forming an extensive and complete equipment that it is possible to produce more different scenes than on any stage in the country. Fifteen hundred white, blue, red and amber lights, controlled from a switchboard seven feet high and twelve feet long are required to light the stage properly. These are subdued and softened as necessary by bank after bank of dimmers arranged by interlocking devices to control the degree of light at any one point of en masse. The dawn of day, a nightfall or a moonlight effect can be reproduced with marvelous fidelity…To the rear of the stage are property rooms, etc. and on the third floor a large wardrobe room, with cases for the various costumes.”
The 1913 article concluded, “”The complete cost of the building has not been, as yet, made public but it is expected to be close to $230,000. Other items not included in the building cost are:
Organ $23,000.00
Stage Scenery $28,000.00
Furnishings $21,000.00
Ground $34,000.00
Making an estimated cost of the complete equipment of about $350,000.”
The article ended here.
Today’s monetary equivalent of $28,000 spent in 1909 for a Scottish Rite scenery collection is $773,024.62. Dallas was only one of six Scottish Rite collection supervised by Thomas G. Moses that year. The others were in San Francisco, CA, Cleveland, OH, Kansas City, KS, Winona, MN, and Atlanta, GA. Keep in mind that Masonic work only made up 25 -30% of all work at the Sosman & Landis studios. The firm, like the Scottish Rite, was accumulating a massive amount of money at this point.
In a letter from Brown to William G. Bell at the Austin Scottish Rite, dated July 7, 1912, Brown provided further information pertaining to the Dallas Scottish Rite stage. This correspondence was to help Austin Scottish Rite bodies understand the design and delivery process; Sosman & Landis could not provide estimates or cost and installation without knowing how much scenery was needed and the structural condition of the building. Brown used the Dallas Scottish Rite as an example, writing, “the Dallas stage has in the neighborhood of 25,000 lineal feet of wire and rope in its installation; the quantity of wire and rope necessary, is determined by the heighth of the gridiron, the location of the fly gallery, and the general dimension of the stage. We would also have to look into the question of freight charges and be advised as to what prices we could obtain common gray iron castings in Austin for use as counterweights. We would have to determine on the correct number of drops to be used, because each drop requires eight pulleys besides counterweight frames and eye bolts.” These costs all needed to be estimated prior to providing a number, yet the Austin Scottish Rite kept asking, “but how much will it cost?”
Brown continued, “In our original correspondence, Mr. Green of Dallas, indicated that he was preparing plans for remodeling an old building [in Austin] and that when these plans were determined upon, he would send us the dimensions of the stage. Mr. Green understands what would be wanted, as he had the experience on the Dallas Temple.” Again, Brown was referring to Herbert M. Green, the architect and a member of the Scottish Rite and the Ancient Arabic Order of the Nobles of the Mystic Shrine.
To be continued…