Copyright © 2020 by Wendy Waszut-Barrett
One of the projects that I am working on right now is establishing artist provenance for each piece of scenery at the Tabor Opera House in Leadville, Colorado. This means creating a biography for scenic artists and stage mechanics who manufactured scenery and stage machinery for the Tabor Opera House and Tabor Grand Opera House. When possible, I link a specific creator with an extant artifact. This week, the focus of my search was J. C. Alexander, a well-known stage carpenter in Colorado from 1883-1908. The story of his life and career took shape as I read dozens of articles about his projects in relation to the Tabor Grand Opera House and the Colorado Circuit.
I doubt that H. A. W. Tabor understood much about theatre stages when Tabor Opera House was built in 1879. The architects and contractors failed to include experienced theatre professionals in the early planning; always a crucial and costly mistake. Although Tabor hired a very skilled fresco artist (J. E. Lamphere) and a capable carpenter (Mr. Barber), their stage arrangements failed upon repeated use. This did not mean that Lamphere of Barber were unskilled, they simply did not specialize in scenic illusion, stage machinery and stage transformations.
By 1882, the Tabor Opera House auditorium and stage underwent a pretty substantial rebuild. The roof was lifted up for acoustics and the stage appointments completely redone. Of the stage work, the “Leadville Daily Herald” reported, “there will be a change for the better in regard to scenery, scene shifting and drop curtains. Those ridiculous hitches in scene shifting that have heretofore occurred on one or two occasions will no longer take place. An experienced stage man has been secured in the person of Mr. H. C. Sprague, who has had extensive experience in the east” (August 23, 1882). H. C. Sprague became the stage carpenter for the Tabor Opera House in Leadville, and J. C. Alexander became the stage carpenter for the Tabor Grand Opera House in Denver. Of the two, Alexander became integral in helping mechanically prepare venues for inclusion in the Colorado Circuit.
At some point between 1879 and 1882, Tabor realized that the key to securing touring shows was the backstage appointments. A specific set of stage accommodations attracted touring shows; you can’t put on a successful production without the necessary equipment. Regardless of the extravagance spent on front of house accommodations, it was the backstage area that mattered and attributed to securing popular productions.
Getting class acts to Denver, let alone to Leadville, was expensive. The only way to increase profits was to have the same production tour several venues in the area, or stop on their way to another location. This meant that the traveling costs were divided among the various theaters, reducing the overall expense for each house. Ultimately, western theatrical circuits saved money by sheer volume of venues. Simply offering multiple stops on a tour, however, was not enough to engage a touring company. The stage accommodations had to technically support each show.
For example, when the Grand Central theatre opened in Leadville only a month after the Tabor Opera House, it became quickly apparent that the Grand Central had a far superior stage. The only way for the Tabor Opera House to overcome this deficiency was to connect with a larger metropolitan venue and become part of a circuit – the Tabor circuit. When Denver’s Tabor Grand Opera House opened in 1881, it became the life blood for Tabor’s much smaller venue in Leadville. Without the connection to the Tabor Grand, I doubt that the Tabor opera house would have weathered any of its Leadville competition. Even with featuring the same touring productions as the Tabor Grand, the Tabor opera house had to improve their scenic appointments, hence, the 1882 renovation. The improvements necessitated the involvement of a stage carpenter and scenic artist intimately familiar with the demands of touring companies. Enter Henry E. Burcky, J. C. Alexander and H. C. Sprague. Keep in mind that “stage carpenter” is interchangeable with stage mechanic and stage manager at this time.
After the 1882 renovation of Leadville’s Tabor Opera House, the Tabor Grand Opera House began to hire out the services of their stage carpenter and scenic artist (Burkey and Alexander). This was an attempt to improve regional stages, thus establishing appropriate stops on a western circuit – the Colorado Circuit. In 1885, Alexander and Burcky transformed DeRemer’s rink into the new DeRemer Opera House. One article published in the “Colorado Weekly Chieftain” on Dec. 29, 1885, interviewed Alexander about a possible stage renovation.
The renovation would allow Pueblo to host the same touring shows featured at the Tabor Grand Opera House. There was incentive for both of Tabor’s theaters, as well as the Pueblo community. Here is the 1885 article in its entirety:
“On Sunday, Mr. J. C. Alexander, the stage manager and master mechanic of the Tabor Grand opera house, Denver arrived in the city for the purpose of taking a look at DeRemer’s rink and giving an unbiased opinion as to what could be done towards converting it into an opera house. Mr. Alexander was astonished and greatly pleased at the building, it was so much superior in every way to what he expected to see. The building is both longer and wider than the Tabor Grand, and all it lacks to make room equal to the Tabor Grand auditorium in every way is height. Desiring to get Mr. Alexander’s unbiased opinion regarding the proposed scheme, a Chieftan reporter tackled him yesterday afternoon. We inquired if he thought the rink could be converted into a first class opera house.
“Certainly, sir,” said Mr. Alexander, “It can be converted into an opera house second only to the Tabor Grand in Colorado. I have studied this hall thoroughly that last few hours, and I can tell you it can be made into a splendid theater – a theater where any company visiting Colorado can play and show all of their scenery. “Here,” said he, “you will see we have a working stage of 40×76 feet between walls, with the same width of proscenium opening as the Denver stage. It can be and will be furnished with five sets of working grooves, same as the Tabor, to fold back the fly galleries and give a clear working space in width of 48 feet. We also have a clear working height to the rigging loft of 26 feet, five sets of border lights and the footlights complete the same as we have at the Tabor. To start in with Mr. DeRemer proposes to put in eleven sets of complete scenery, besides a beautiful drop curtain. The eleven sets of scenery, as the house progresses towards completeness, can be painted on the reverse side, thus giving twenty-two sets of beautiful scenery. Here also we will have ample space for scene room, property room and eight dressing rooms. With these improvements any special bit of scenery painted for the production of a special play at the Tabor Grand, will be sent over the Colorado circuit, the completion of this improvement making it possible to set the Tabor scenes at Colorado Springs, Pueblo and Leadville, but Pueblo to the greater advantage that elsewhere on the circuit, because here you will have the largest and best appointed theater on the circuit, and be possessed of every facility to produce attractions as they should be produced. The people of Pueblo will never have such an opportunity to get a good opera house again. I will tell you why. They are only asked to make a temporary loan of $3,000 towards making all these improvements. Now the fact is the improvements contemplated will cost nearer $6,000 than $3,000, yet I understood Mr. DeRemer to say that if the people put up the $3,000 asked for the improvements will be made as contemplated regardless of the extra cost. He further tells me that he will expend every dollar of surplus earnings of the house in making improvements in the building. The fact is that people ought to advance $6,000 at once instead of $3,000.
“How many people can be seated in this building as now planned.” Asked the reporter.
“About 900,” replied Mr. Alexander, “or nearly 200 more than can be seated on the first floor of the Tabor Opera House. The seats will all be elevated and nicely arranged provided the project can be carried out, and there will not be a bad seat in the house. The height of the stage will be three feet ten inches from the floor and everything will be permanent about the stage, it can be dug out underneath after it is started and the pit and traps put in. In the same way the roof can be raised at any time, and these things I am assured will be done as fast as possible. If this scheme goes through the Tabor Grand has agreed to play all its attractions here permanently. That is why I am here and taking such an active interest in the way the work of improvement is to be done.
“Could a building about 130×52 feet be converted into a first class or even possibly good opera house, Mr. Alexander,” inquired the reporter.
“No, sir,” said Mr. Alexander; “it could not, and for the very obvious reason that such a building would lack one of the great things which a theater mush have – and width, What kind of a stage you put within fifty-two feet? What kind of scenery could you put up? Such a structure would be an abortion, so far as using it for theatrical purposes is concerned. The only way to convert a building fifty feet wide into a theater would be to tear down the structure, rebuild it and add about thirty feet more to its width.
Leaving Mr. Alexander the reporter hunted up Mr. J. R. DeRemer and Mr. George M. Haight, to find out what truth, if any, there was in the statement that the improvements to be made in the rink would cost $6,000.
“Yes,” said Mr. Haight, “Mr. Alexander thinks the improvement will cost much but if the people put up the three thousand dollars asked we will make the improvements at once.
“Yes,” said Mr. DeRemer, “and you can just tell the people that whatever Mr. George M. Haight says about this matter goes. He represents me in this matter fully and I will carry out whatever he agrees to do. It is estimated these improvements will cost $6,000, but we have only asked for $3,000, and as soon as that sum is subscribed we will commence this work with a vim. I will say further that every surplus cent of earnings of this house will be used to improve and beautify the structure until Pueblo has a first class opera house. I don’t think I can say any more, It now remains to be seen whether the people want an opera house. The people, however, are asked for but $3,000, as a temporary loan. The only feasible plan to secure an opera house is to make up this $3,000 fund at once. All other propositions are chimerical and impossible. If we can’t raise the sum asked by DeRemer we can’t raise anything for an opera house, but we believe this sum can be raised, and we hope to announce it has been subscribed before the week is out, Of the sum asked there only remains $1,000 to be raised. Now don’t refuse to put your name down when called upon. We can all afford to help this project along liberally and it is our duty as good citizens, with the prosperity of the town in view, to do so cheerfully and promptly.”
On January 7, 1886, the “Colorado Daily Chieftain” announced. “If the people of Pueblo want a first class opera house, let them wait on Mr. J. R. DeRemer or Mr. George M. Haight to-day and subscribe a loan of $525 towards the DeRemer opera house project, and our word for it, work will be commenced tomorrow. It this is not done very few of the Tabor Grand attractions will visit Pueblo in the future.” That almost sounded like a threat, but the money was soon raised and on February 3, 1886, DeRemer’s Opera House opened to the public. The “Colorado Daily Chieftain” reported, “During the past few weeks many people, of course, have visited what was formerly known as the finest skating rink in the west and watched the transformation in progress, but for all that there were few people present at the opening last night who were not surprised and astonished at the beautiful appearance of the interior of the new theaters…the stage is the largest in the state beside the Tabor Grand at Denver. It is furnished with all the scenery paraphernalia required in all first class opera houses. This work has all been done under the personal supervision of Mr. Maynard, assistant stage manager at the Tabor Grand…Pueblo is now accredited with the best equipped and largest opera house outside of Denver and in the state…Pueblo ought to be proud of DeRemer’s opera house; it is a first class place of amusement now, and in time we feel certain it will be excelled by few in style and finish.”
There were many more changes to go, including the raising of the roof to make it three stories high, but the house was open. Once the roof was raised, the seating would be divided into a parquet, dress circle, balcony and gallery.
Tomorrow, I will continue to explore the life and career of John C. Alexander.
To be continued…